CVE records

Every CVE as the CVE Program publishes it, refreshed every ten minutes, with NVD's analysis, CISA's known-exploited status and a healthcare tag. Subscribers get the CVEs that match their own systems on My program, by email as they are published. Where the data comes from: sources.

Updated under an hour ago ()

What this means for you

This week: 5,437 CVEs published, 357 critical, and 7 newly confirmed exploited. Add your stack to see whether any of them hit you.

Published in the last 7 days
5,437
Show in the list
Critical, last 7 days
357
Show in the list
Healthcare-tagged, last 7 days
4
Show in the list
Known exploited (CISA KEV)
1,747
Show in the list

Showing CVEs that name the product oracle:primavera_p6_enterprise_project_portfolio_management. Show all products

14 CVEs, showing 1 to 14
CVESeverityTitlePublished
CVE-2021-45105
Healthcare
Medium 5.9Apache Log4j2 does not always protect from infinite recursion in lookup evaluation
Assigned by apache
Dec 18, 2021
CVE-2021-2351
Healthcare
High 8.3Vulnerability in the Advanced Networking Option component of Oracle Database Server.
Assigned by oracle
Jul 20, 2021
CVE-2020-5421
Healthcare
High 8.7RFD Protection Bypass via jsessionid
Assigned by pivotal
Sep 19, 2020
CVE-2019-10219
Healthcare
Medium 6.5A vulnerability was found in Hibernate-Validator.
Assigned by redhat
Nov 8, 2019
CVE-2019-17091
Healthcare
Medium 6.1faces/context/PartialViewContextImpl.java in Eclipse Mojarra, as used in Mojarra for Eclipse EE4J before 2.3.10 and Mojarra JavaServer Faces before 2.2.20, allows Reflected XSS because a client windo…
Assigned by mitre
Oct 2, 2019
CVE-2018-19360Critical 9.8FasterXML jackson-databind 2.x before 2.9.8 might allow attackers to have unspecified impact by leveraging failure to block the axis2-transport-jms class from polymorphic deserialization.
Assigned by mitre
Jan 2, 2019
CVE-2018-19362Critical 9.8FasterXML jackson-databind 2.x before 2.9.8 might allow attackers to have unspecified impact by leveraging failure to block the jboss-common-core class from polymorphic deserialization.
Assigned by mitre
Jan 2, 2019
CVE-2018-19361Critical 9.8FasterXML jackson-databind 2.x before 2.9.8 might allow attackers to have unspecified impact by leveraging failure to block the openjpa class from polymorphic deserialization.
Assigned by mitre
Jan 2, 2019
CVE-2018-14718Critical 9.8FasterXML jackson-databind 2.x before 2.9.7 might allow remote attackers to execute arbitrary code by leveraging failure to block the slf4j-ext class from polymorphic deserialization.
Assigned by mitre
Jan 2, 2019
CVE-2018-14719Critical 9.8FasterXML jackson-databind 2.x before 2.9.7 might allow remote attackers to execute arbitrary code by leveraging failure to block the blaze-ds-opt and blaze-ds-core classes from polymorphic deseriali…
Assigned by mitre
Jan 2, 2019
CVE-2018-5407Medium 4.7Simultaneous Multi-threading (SMT) in processors can enable local users to exploit software vulnerable to timing attacks via a side-channel timing attack on 'port contention'.
Assigned by certcc
Nov 15, 2018
CVE-2018-0735Medium 5.9Timing attack against ECDSA signature generation
Assigned by openssl
Oct 29, 2018
CVE-2018-11039
Healthcare
Medium 5.9Spring Framework (versions 5.0.x prior to 5.0.7, versions 4.3.x prior to 4.3.18, and older unsupported versions) allow web applications to change the HTTP request method to any HTTP method (including…
Assigned by dell
Jun 25, 2018
CVE-2016-0635
Healthcare
High 8.8Unspecified vulnerability in the Enterprise Manager Ops Center component in Oracle Enterprise Manager Grid Control 12.1.4, 12.2.2, and 12.3.2; the Oracle Health Sciences Information Manager component…
Assigned by oracle
Jul 21, 2016

CVSS is the assigning CNA's score where it gives one, otherwise NVD's. The healthcare tag is a documented heuristic (a list of clinical and health IT vendors, and clinical terms in the description), not a classification. The CVE record is authoritative.

Your cookie choices
We use essential cookies to run this site, and, only with your consent, an advertising cookie from Google to measure whether our ads lead to sign-ups and subscriptions. See our for details.